You can use this setup during the design phase when custom hardware is not yet available.
For the Power Profiler Kit (PPK), this is a typical configuration that allows quick setup and current measurements in reference applications from the SDK or in custom applications.
In this case, the connection to the Power Profiler app is provided by the SEGGER J-Link on the nRF5 DK with a power supply applied on the Development Kit (DK). The configuration for this use case is shown in the following figure.
Make sure that the following are configured: